INTRODUCTION LAND SURVEY

  • - Basic,SI,Unit
  • - Object of Surveyer
  • - Principal of Surveyer

CHAIN SURVEY

  • - Study Experiment
  • - Handling for chain
  • - Measuring Distance
  • - Area Calculation
  • - FMB Detailes

TOTAL STATION (EDM)

  • - Introduction
  • - Standard Equipment
  • - Application of Total Station
  • - Fill Managing
  • - Offset Measurement
  • - Refevenea Element
(i) Topograbhieal Survey
(ii) Setting out
(iii) Contour and Detailed map
(iv) Angle and Distance Measurement
(v) Co-ordinate Method
(vi) REM-Measured
(vii) Area & volume calculation
(viii) Road,Raclaky,Conod,Construction using Mapping & locating
(ix) Co-ordinate Calculation
(x) Data Transfer

LEVELLING

  • - Introduction
  • - Setting Out of Level Instrument
  • - Field Measured
  • - Method of levelling and
  • - Calculation,Graph

GPS

  • - Introduction
  • - Principals & Concepts
  • - Application in Civil Engg
  • - Way Point & Tracking Method

DGPS

  • - Base,Rover,GPS Connections & Settings
  • - Setting out
  • - Sample Road Project
  • - Data Downloading Processing
  • - Converting Survey Data in Auto cad format

Quantity Surveying

Module 1
    Understanding the Basics of UNITS System
  • - How to READ the DRAWINGS
  • - Documentation controller works
  • - More on UNITS and Dimensions with Practical Applications
  • - Role of Quantity Surveyor in Pre construction Stage
  • - Quantity Calculation for Excavation Works
  • - Quantity Calculation works for Footings or Underground
  • - Underground works : Shuttering, Steel, footing concrete calculation steps in EASY METHODS
  • - Quantity Calculation for above the Ground Works
  • - Quantity Calculation for Plinth Beams, Columns, SLAB Beams, SLABS, etc.
  • - Quantity Calculation for Finishing Works, Brick work calculation, Plaster Calculation ( In and out), Painting, Wood Works calculation etc.
  • - Interior works Calculation and Important steps to REMEMBER while doing MEP ( Mechanical, Electrical and Plumbing) Related Quantity Calculation methods and STEP by Step Procedures
  • - Role of Quantity Surveyor during Construction stage
  • - Weekly Bill Preparation How and Why
  • - Work order Preparation STEPS
  • - What is BOQ and role of Quantity Surveyor in Preparing the BOQ
  • - Other important documentation and reports preparation steps
  • - What is Cash Flow
  • - BILL Preparation, HOW to Check the BILLS, BILL Certifications
  • - How to close a BILL
  • - Role of Quantity Surveyor in Post Construction Works


  • Module 2
    Estimation and Quantity Calculation
  • - What is RATE ANALYSIS
  • - RATE ANALYSIS Steps for various items
  • - What is Tendering and How Tendering Process happens
  • - What is a Contract and Types of Contracts
  • - How to choose a Suitable Contract
  • - Contracts Management
  • - Negotiation Techniques
  • - Purchase orders & Work orders
  • - Other topics related to Quantity Surveyor's job
  • - How to become a GOOD Quantity Surveyor
  • - What to do after attending Quantity Surveying course


Construction Safety

Safety health and welfare Construction Sites
  • - Safety Organization and Management
  • - Site planning and layout
  • - Excavations
  • - Scaffolding
  • - Ladders
  • - Hazardous Processes
  • - Vehicles movement of materials
  • - Crane Safety
  • - Lifting Appliances and gear
  • - Working Positions Tools and Equipment
  • - Working Environment
  • - Personal Protecting Equipment [PPE]
  • - Pile- Driving
  • - Work over Water
  • - Demolishing
  • - Welfare Facilities
  • - Safety Of Work Places
  • - Transport Earthmoving and materials handling equipment
  • - Work at heights including roof work


  • Building Quality Management

    Quality Management
  • - Quality Systems
  • - Planning
  • - Assurance and Control
  • - Improvement techniques